人人终身学习知识网~是各类综合知识资源信息分享,提升综合素质与提高知识技能的终身学习网络平台

 找回密码
 立即注册

QQ登录

只需一步,快速开始

微信登录

微信扫码,快速开始

2015年GMAT句子改错练习题及详细解析(14)

[复制链接]

考试吧整理“2015年GMAT句子改错练习题及详细解析”更多GMAT改错练习题等,请访问考试吧GMAT考试网!

  2015年GMAT句子改错练习题及详细解析汇总

  49. The automotive conveyor-belt system, which Henry Ford modeled after an assembly-line technique introduced by Ransom Olds, reduced from a day and a half to 93 minutes the required time of assembling a Model T.

  (A) from a day and a half to 93 minutes the required time of assembling a Model T

  (B) the time being required to assemble a Model T, from a day and a half down to 93 minutes

  (C) the time being required to assemble a Model T, a day and a half to 93 minutes

  (D) the time required to assemble a Model T from a day and a half to 93 minutes

  (E) from a day and a half to 93 minutes, the time required for the assembling of a Model T

  答案解析如下:

  (A)from a day and a half to 93 minutes the required time of assembling a Model T

  【错误】 简洁明了:在GMAT语法题中表达同一个意思时,简洁性从高到低依次为动词、形容词和副词、一般名词、动名词(简称VANing原则:V——verbA——adj.或adv.,N——nouning——动名词),所以“the required time of assembling”相比 (D)中“time required to assemble”较不简洁。

回复

使用道具 举报

小黑屋/人人终身学习知识网~是各类综合知识资源信息分享,提升综合素质与提高知识技能的终身学习网络平台

Powered by 5wangxiao

© 2007-2021 5wangxiao.Com Inc.

快速回复 返回顶部 返回列表