人人终身学习知识网~是各类综合知识资源信息分享,提升综合素质与提高知识技能的终身学习网络平台

 找回密码
 立即注册

QQ登录

只需一步,快速开始

微信登录

微信扫码,快速开始

[六级大学英语阅读] 大学英语六级考试阅读练习题(7)

[复制链接]

  In the early days of nuclear power, the United States make money on it. But today opponents have so complicated its development that no nuclear plants have been ordered or built here in 12 years.

  The greatest fear of nuclear power opponents has always been a reactor meltdown. Today, the chances of a meltdown that would threaten U. S. public health are very little. But to even further reduce the possibility, engineers are testing new reactors that rely not on human judgment to shut them down but on the laws of nature. Now General Electric is already building two advanced reactors in Japan. But dont expect them even on U. S. shores unless things change in Washington.

  The procedure for licensing nuclear power plants is a bad dream. Any time during, or even after, construction, an objection by any group or individual can bring everything to a halt while the matter is investigated or taken to court. Meanwhile, the builder must add nice-but-not-necessary improvements, some of which force him to knock down walls and start over. In every case when a plant has been opposed, the Nuclear Regulation Commission has ultimately granted a license to construct or operate. But the victory often costs so much that the utility ends up abandoning the plant anyway.

  A case in point is the Shoreham plant on New Yorks Long Island. Shoreham was a virtual twin to the Millstone plant in Connecticut, both ordered in the mid-60s. Millstone, completed for $ 101 million, has been generating electricity for two decades. Shoreham, however, was singled out by antinuclear activists who, by sending in endless protests, drove the cost over $ 5 billion and delayed its use for many years.

回复

使用道具 举报

小黑屋/人人终身学习知识网~是各类综合知识资源信息分享,提升综合素质与提高知识技能的终身学习网络平台

Powered by 5wangxiao

© 2007-2021 5wangxiao.Com Inc.

快速回复 返回顶部 返回列表