403 The design of the process piping is performed directly on a model of the project. 工艺配管的设计是直接按照工程项目的一个模型完成的。 404 The model is an actual working tool for piping. 模型是配管用的实际工具。 405 Piping erection work include: prefabrication, placing, aligning, welding and bolting. 管道安装工作包括:预制加工、安置、对准、焊接和连接。 406 Our piping prefabrication workshop covers a total area of 1000m2. 我们的管道预制加工厂拥有一千平方米的面积。 407 We can perform the pipe by following operations: cutting and mechanical chamfering, manual and automatic welding. 我们可以对管子进行下列预制加工:切割和机械加工坡口,手工和自动焊接等。 408 The computer generates isometric drawings and prints out bill of materials. 计算机绘出管道空视图,并打印出材料明细表。 409 We shall complete the manhour requirements for the site fabrication (site erection ) of this drawing. 我们将制订这张图纸现场制作(现场安装)所需的工时条件。 410 Seamless steel tube is made in sizes for 1/8 to 24 inches. |